Every year, when we are heading towards the hottest time of the year, we try to keep cabin builds to a minimum.   Installing metal roofing in 35 degrees plus heat is just no fun at all!  But normally, November is still overall ok.  Plus, this Hervey Bay build site was surrounded by large palm trees, providing shade all day.  The CHLOE 9 we built over three days will be used as an office - the main residence on site will soon be too small due to the pending arrival of a new family member!

Ground Preparations

The site owners Kirrily and Will chose our popular CHLOE 9 cabin not only because it provides pre-drilled electrical holes through the center of the logs (a must for an office room!) but also because its rectangular shape fitted perfectly into a narrow space behind their garage.

Will did an excellent job removing all vegetation, covering the ground with weed matting and a layer of gravel.

He also removed an old pergola, moved the canoe to the rear out of the way, and cleared both side access ways to the site from the front of the property.

The actual space was still a very tight squeeze.  We positioned the rear wall of the cabin as close to the old pergola as possible.

Digging Holes....

Main water and sewerage supply lines often run from the main front road to the rear of the property, to the main residence.  This means that anywhere in between, great care needs to be taken when digging post holes.  Using a powered auger digger is out of the question, all post holes had to be dug by hand.

And as expected, we "found" both the storm water pipe as well as the mains pressure pipe close to the two post holes closest to the front of the cabin.

Luckily, we were able to work around these by slightly moving the post holes.

Steel Base and Treated Pine Frame

Due to the 4.5m length (depth?) of the CHLOE 9 we increased the "C" purlin size from 100mm to 150mm.  By further adding centre noggins we provided a steel base with more than enough structural strength to support the cabin.

A treated pine base frame always comes with all our cabins.  It can also be placed on pavers or a concrete slab if you like, we just think that the steel base is the quickest, easiest and cheapest way to create a sturdy and long lasting base for your cabin.  The first layer of logs is squared up and then screwed down in the four corners only.  The wall logs are then pushed against the particleboard flooring and screwed down, creating a neat gap-free finish.

Walls - the fun part...

Once the foundation is done, and the particleboard flooring is installed, it's time to start building up the log walls.

This is the most rewarding part of your cabin build, as the walls go up quickly and just look great.  It is also at this stage that the true size of the cabin is revealed, and we love hearing owners say "wow, it's much bigger than I thought!"

As a typical office space, owner Will decided to install two windows one log wall row down from what is shown on the plans.  This will allow him to enjoy the leafy outlook when sitting at his desk!

Windows and Doors

One window always comes with your cabin.  We also offer additional windows, to allow more daylight to enter your cabin.  They also help with cross ventilation.

Timber often has a mind of its own...as a naturally grown building product, log walls sometimes go out of alignment.  The door image on the left shows a temporary ratchet strap we installed.  This strap squared up the two front walls, which in turn guaranteed the proper alignment of the two doors later.  It is a good idea to overdo the squaring up a little, as timber will move back slightly when the strap is being removed after the roof has been installed.

Roof Boards

For many years now we import European made log cabins without any fixing hardware, as it sometimes does not comply with Australian building regulations.  For example, chrome-coated shiny nails are supplied for the roof boards, which will not secure the metal COLORBOND roof in 150km/h tropical cyclone winds.

We replace these with 45mm gal coated outdoor screws.  Installing the roof boards this way is much more time consuming, but also much stronger!

Roof boards are strong "T&G" (tongue and groove) 18 x 135mm and guarantee the authentic log cabin look when looking up inside your cabin.  Using JUST the corrugated iron roofing is NOT the solution!

Now THAT's squeezy....

Sometimes, space in backyards available for cabin builds is limited, we get that.  We love a challenge - like here installing the cabin as close as possible to the old pergola, which owner Will wanted to keep.

The steel base frame was installed accordingly, taking into account the additional space needed for the treated pine base frame (5mm), the log walls (another 5mm), the rear roof overhang (200mm), plus the timber barge boards and the metal barge flashing (20mm).  Also, the cabin side wall needed to clear the PA door for the garage....it just worked out.

All done

Another successful cabin build.

We always remove all our rubbish (or place it in bins provided on site), and leave every log cabin build site as clean as we possibly can.

We apply the same principles to each build as we would to building one of these cabins in our own backyard.

All our cabins are covered by a full 5-year warranty, however, unlike electronic equipment or electrical appliances, log cabins can't rally "break down" or suddenly "stop working".  Once the cabin has been built and painted or oiled and the logs have settled (over a 12 to 24 months period) it will give you many years of enjoyment.